Changes to church buildings and churchyards are governed by Faculty Jurisdiction and permission is required from the Chancellor of the Diocese or your Archdeacon for most works of repair, adaptation and improvements to churches.
Faculty Jurisdiction is legal exemption from requiring Listed Building Consent from the local authority but many works will still require Planning Permission.
The Chancellor and Archdeacons are advised by a diocesan body called the Diocesan Advisory Committee (DAC). The DAC is a formal group of volunteer specialists who give their time feely to assist parishes in the care of churches. This support is offered both through considering applications for permission but also by aiding churches in developing proposals and in the general management of churches.
In exercising their role, the DAC must have due regard to a church as a local centre of mission and ministry in addition to considering the special character or significance of the church building.
If you would like to request a meeting or a site visit from one of the Church Buildings Team staff (who support the DAC) or a DAC specialist adviser, please make contact via churches@cofe-worcester.org.uk or 01905 732809.
Click the headings below to expand sections. If this does not work, you may need to reset your browser cache.
Faculty jurisdiction & the DAC
How do I apply for permissions?
All applications for permission under the Faculty Jurisdiction Rules are undertaken via the Online Faculty System. You need to be a registered user for your parish to make an application.
You need to determine what level of permission you require for your works. Generally, works that are of repair or that do not affect the character or significance of the church building will not require a full faculty and will feature on either List A (no permission required) or List B (permission required from the Archdeacon) of the rules.
Additional Matters Orders (AMO)
An Additional Matters Order (AMO) sets out certain works (with conditions) that may be carried out without the usual requirement for a faculty. The Chancellor has issued two Additional Matters Orders: the AMO regarding the planting of plants (not trees) permits planting in certain circumstances without the need to apply for List B permission. The AMO relating to temporary heating allows specified solutions to be considered (with conditions) under a List B application as opposed to a full faculty.
Download List A & B brochure
A flowchart detailing the complete process for applying for a faculty can be found here.
Statements of Significance and Need
Faculty applications will require statements of significance and need. See the guidance and templates available here for help with this.
PCC resolution
Faculty applications (and sometimes List B applications, depending on their scale) need to be supported by a PCC resolution. The template to use for this can be downloaded here.
Consultation
For works that affect the character or significance of the church building (usually only for listed buildings), consultation with external bodies who hold a statutory interest in the building will be required. The Church Buildings Team will guide you through this and undertake consultations through the online portal. Consultees include:
- Historic England
- The National Amenity Societies (based around era of interest)
- The Society for the Protection of Ancient Buildings (SPAB) – pre 1700
- The Georgian Group – 1700-1837
- The Victorian Society – 1837-1914
- The Twentieth Century Society – Post-1914
- The Council for British Archaeology
- Historic Buildings and Places (previously the Ancient Monuments Society)
- The Local Planning Authority
- The Church Buildings Council
- The Commonwealth War Graves Commission
- The War Memorials Trust
What other permissions are required?
Often, further secular permissions will be required in addition to a Faculty. Depending on the type of work you may require one or more of the following:
- Building Regulations approval
- Planning Permission
- Scheduled Monument Consent
- Bat (or other wildlife) Licence
- Tree Preservation Orders or Tree works in a Conservation Area
The Church Buildings Team will advise on whether further permission will be required.
DAC Members & Specialisms
DAC Members
Murray Andrews, Archaeology
Ven. Mark Badger, Archdeacon of Worcester
Jane Bamber, Fund raising and engagement
Michael Bellamy, Historic artefacts and plate
Tim Bridges, Historian
Jane Chamberlain, Conservation Architect
Ian Cramp, Vice-chair; Lighting & Electrical Adviser
Robert Davies, Conservation Architect
Joanna Daykin, Conservation Architect
John Dentith, Diocesan Synod – House of Laity
Rosanne Eardley, Building surveyor
Chris Goucher, Quantity surveyor
Ven. Nikki Groarke, Archdeacon of Dudley (ex-officio)
Jeffrey Howarth, Combined Amenity Societies
Father Adam Hadley, Diocesan Synod – House of Clergy
Simon Henderson, Conservation Architect
Lewis Hobbs, Conservation Architect
Ven. Robert Jones, Chair
Corey Lane, Historic timber and woodwork
Victoria Poole, Conservation Architect
Matthew Vaughan, Conservation Architect
Sue Wright
Advisers to the DAC
Jonathan Ansell, Turret Clocks Adviser
Gordon Birks, Bells Adviser
Andrew Bessant, AV Systems Adviser
Derry Clifford, Turret Clocks Adviser
Graham Davies, Organs Adviser
Dan Herbert, AV Adviser
Robert Kilgour, Conservation Architect
Susan Logan, Heating Adviser
Richard Peplow, Church Plate Adviser
Chris Povey, Bells Adviser
Mohammad Salami, Structural Engineer Adviser
Rachel Sycamore, Church Furniture, timber artefacts and furnishings
Staff
Mark Carter, Director of Church Buildings & Net Zero; Secretary to the Committee
Hannah Taylor, Church Buildings Officer; Assistant Secretary to the Committee
Kay Shuard, Church Buildings Team Administrator
DAC Meeting dates
2026 DAC meetings take place on:
Date of DAC | PCC to have submitted validated application at the latest by: |
18 December 2025 | 23 October 2025 |
29 January 2026 | 27 November 2025 |
24 March 2026 | 27 January 2026 |
19 May 2026 | 24 March 2026 |
21 July 2026 | 26 May 2026 |
29 September 2026 | 4 August 2026 |
24 November 2026 | 29 September 2026 |
2027 DAC meetings
Date of DAC meeting | PCC to have submitted a validated application at the latest by: |
Tues 19th January 2027 | 24th November 2026 |
Tues 23rd March 2027 | 26th January 2027 |
Tues 18th May 2027 | 23rd March 2027 |
Tues 20 July 2027 | 25th May 2027 |
Tues 28th September 2027 | 3rd August 2027 |
Tues 30th November 2027 | 5th October 2027 |
The tables above shows the latest dates by which applications generally need to have been submitted and validated in order to be considered at a particular DAC meeting. In part, this is because the consultation period for applications which require statutory consultation is 6 weeks. Minor cases can be considered under delegated authority and not need to be presented to the full committee. Please speak to a member of the Church Buildings Team to work out the timescale for your application. Contact the team: churches@cofe-worcester.org.uk / 01905 732809.